top of page

CSV Project Support - Facility Start-Up

Updated: Jul 31

Client: Vor Biopharma (Cambridge, MA)



Project Scope


In 2020, the client took occupancy of a newly fit-out 32,000 SF lab/office space. In support of operational readiness initiatives, Mission BPS was selected to help establish and implement the site's System Development Lifecycle (SDLC) roadmap, subsequently leading GAMP-5 and CSA-compliant deployment of numerous GMP-critical applications, including CMMS, EMS, MES, ERP, and eQMS solutions.



Dynamic Strategies


As the scope of software solutions ranged from configured hardware/infrastructure (GAMP Cat.1) to configured applications (GAMP Cat.4), each deployment project required a unique risk-based approach for implementation and subsequent change management.


GAMP Category 1 Systems: Where systems consisted of in-house infrastructure and/or Infrastructure as a Service (IaaS), consolidated planning and design phase deliverables (such as an all-encompassing Functional & Design Specification document) were developed and risk-assessed to yield both a basis of design and a basis of test scope in a streamlined effort. The scope of subsequent testing, in many cases, was reduced to the verification of complex configuration attributes.


GAMP Category 4 Systems: With (SaaS) platforms, particularly those custom tailored to suit the client's business processes, a more traditional GAMP-V model was employed, though it was less efficient in comparison. In such cases, efficiency was gained by emphasizing more robust front-end risk assessment strategies (per CSA guidance) to (a) firmly identify configured attributes of higher complexity/probability of misconfiguration and (b) adopt the efficiency of unscripted testing processes for lower risk out-of-box/standard functionality.



Project Outcome


From Q4 2020 through Q1 2024, I supported the configuration, qualification, and deployment of nine platforms:


  • CMMS: BMRAM R4 Cloud

  • EMS: Schneider Electric EcoStruxure

  • MES: POMSnet Aquila MES

  • GxP Data Management: TetraScience / Tetra Data Platform

  • QMS: IQVIA SmartSolve, Veeva Vault Doc and Training

  • ERP: Oracle Fusion Cloud – Supply Chain Management

  • Clinical Data Transmission: Custom Solution on AWS cloud infrastructure

  • GMP Data Management: Tetra Science TDP

  • Paperless Validation & Change Management: Sware Res_Q


For each platform, I authored plan, design, test, and deployment deliverables through both on-site and remote collaboration, maintaining open communication with all stakeholders - ensuring seamless execution of validation activities while adhering to the client's operational timelines and regulatory expectations.


Recent Posts

See All
Blue Mountain RAM CMMS Deployments

Clients:  Sun Pharmaceuticals (Billerica, MA) Gettinge AB (Merrimack, NH) Thermo Fisher Scientific (Cambridge MA, Lexington MA, and...

 
 
 

Comments


© 2024 by Mission Biopharmaceutical Solutions Corp.

Powered and secured by Wix

bottom of page